LAB 04 / TELECOM
From alarm to verified recovery.
Investigate realistic site incidents inside the shelter and on the tower. Correlate alarms, take measurements and repair the equipment in a traceable sequence.
—
Inspect the fault.
Alarm console
Select an alarm to locate its equipment. Acknowledgement records attention; it does not remove the fault.
Record your hypothesis
Keep your reasoning beside the measured evidence. A hypothesis is not a diagnosis.
Investigation journal
Method & referencesEU / Sweden
Implemented in this lab
Eight deterministic incidents cover optical transport, rectifier shortfall, RF reflection, cooling, timing, VLAN attachment, obstruction-light failure and two simultaneous faults. Alarms map to 3D equipment. Targeted readings, staged maintenance, component retests and a separate end-to-end probe form an auditable learning record. ETSI TS 128 111 provides context; these are not vendor alarm codes or a conformant alarm interface.
The obstruction-light incident uses an illustrative 48 V DC lamp circuit, 0.35 A healthy current and binary light/alarm feedback. Telecom service remains available during this separate circuit repair. The display is not an aviation-lighting design, photometric assessment or regulatory-compliance check.
Model limits
Values, thresholds, severity and service test profiles are illustrative. The model has predefined fault dependencies, simple battery energy depletion and exponential thermal recovery; it does not solve RF propagation, packet routing, thermal airflow or vendor diagnostics. Maintenance pauses service by assumption except for the separate obstruction-light circuit. No production network is queried. Exports are learning records, not regulatory submissions or field work instructions.
Swedish deployment context
For Swedish public electronic communications providers, assess significant incidents under the Cybersecurity Act and PTSFS 2026:5, in force from 15 October 2026. Reporting is through NCSC using the applicable instructions and time limits. A restored service does not by itself remove reporting duties. The lab does not decide legal reportability or submit reports.
- Cisco · Interface down / flap troubleshooting: optical alarms and diagnostics ↗
- Nokia · System management: timing references, PTP and synchronization ↗
- ETSI TS 128 111 V18.8.0 · 5G fault management ↗
- PTS · Swedish Cybersecurity Act / NIS2 ↗
- PTSFS 2026:5 · Significant telecom incidents ↗
- NCSC · Incident reporting guidance ↗
Reference review: 15 November 2026 · Educational scope, no certification or regulatory approval.