LAB — / TELECOM
Know the method. Know the limits.
One shared reference profile for the ASP Labs collection: European standards, Swedish deployment context and explicit model boundaries.
Implemented calculations
The method describes what the code actually computes. References do not imply complete implementation.
Project-specific applicability
Regulatory duties depend on the organisation, site, equipment and jurisdiction. Swedish guidance is for Swedish deployments.
Educational scope
No lab issues a structural approval, radio licence, equipment conformity decision or regulatory incident report.
Orbital Lab
What is implemented
The Orbital v1.3 engine with the 15 November 2026 terrain correction computes the link budgets, handover state and packet observations. The new 3D view consumes its live telemetry; it introduces no replacement radio calculation. ETSI TS 138 331 is a European RRC reference. Regional geometry is distance-normalised; the globe uses the engine’s Earth-centred coordinates for the displayed satellites. The full selected ideal Walker constellation is shown as persistent points on the globe; nearby candidates have enlarged markers. Circular mean motion follows sqrt(mu/a³) and the inertial-to-Earth-fixed rotation uses the same Earth spin and epoch as the preserved engine. The visual clock interpolates only between received engine times, freezes on pause and stops extrapolating when telemetry is delayed. Twelve representative planes are shown. This is not current TLE/SGP4 tracking; J2, drag and station-keeping are omitted. Generated country car routes now use the same elevation for the road and visible terrain; UE height follows the corrected surface. A shared wheel-contact solver aligns the full-simulator car and spatial vehicles with the running surface. Radio-budget equations are retained; corrected road elevation can change obstruction and link results. The route scene uses 161 sampled profile points, adaptive vertical relief and distinct country styling. Road and rail geometry share the vehicle running surface. Decorative terrain is outside a flat road corridor; it is not a digital elevation model. The optional Real Starlink Globe view uses a bundled dated CelesTrak GP/OMM-keyword JSON snapshot and Satellite.js 7.2.0 SGP4. NORAD identities are retained, including six-digit catalog numbers. TEME positions are converted to Earth-fixed coordinates with GMST. A worker computes five-second samples, with display interpolation between them. UTC, element epochs, selected-element age, omitted stale/failed records, and source provenance are displayed or exported. Predictions beyond ±7 days of an element epoch are omitted; this is a lab guardrail, not an accuracy guarantee. Users can load newer GP JSON locally or replay at the snapshot epoch. The snapshot does not refresh automatically. Real-orbit mode hides the teaching radio metrics, candidate satellites, gateway and serving link; Route and Detailed retain the teaching radio model. The full simulator files, route terrain and design are unchanged. The Globe uses flat land and water colors with generalized country borders only. No relief, land-cover texture, geographic labels, graticule or selected-country highlight is rendered.
What is outside scope
Routes, terrain, network sites, radio parameters and constellation availability are teaching assumptions. The model is not an ETSI protocol conformance suite, an operator coverage prediction or a field calibration. Its original technical appendix retains the detailed 3GPP and ITU method references.
EU / Swedish context
For deployment in Sweden, assess PTS spectrum permissions or applicable exemptions separately from the radio model. EU radio equipment market requirements are addressed by the Radio Equipment Directive and applicable conformity procedures. Neither a simulated band nor a successful link demonstrates licence entitlement, CE conformity or service availability. Swedish guidance applies to Swedish deployments; other country editions need their own local rules.
Tower Infrastructure
What is implemented
For each equipment group, effective wind area = quantity × supplied area per unit, mass = quantity × mass per unit, force F_i = q_p × c_s c_d × A_eff,i, and global external moment M_i = F_i × mounting height. All mounting-level actions are summed with a structure wind area distributed uniformly over its height. Equipment weight uses g = 9.80665 m/s². Effective area includes the force coefficient for the selected direction. Project q_p and structural factor must be supplied on an appropriate Eurocode/Swedish project basis; defaults are illustrative. Optional global wind-moment, wind-force, total equipment-mass and mounting-level mass limits produce independent demand/entered-limit ratios. The highest supplied ratio is a screening indicator; unprovided limits remain unassessed. No maximum structural capacity is inferred from type, height or 3D geometry. The optional worked example explicitly supplies illustrative limits, not a structure rating. The interface starts in teaching-assumption mode with fixed illustrative envelopes for the mast, lattice tower and monopole. Immediate utilization and remaining headroom are the highest independent global or level-mass comparison. Changing equipment or wind changes demand without changing those limits. Assumptions can be edited, restored or replaced through project-limit mode, which clears the assumed global and level limits. An export records the capacity basis. Teaching defaults are not inferred structural resistance or manufacturer ratings. Each 3D level ring and label compares its equipment mass with that level’s limit: below 80% green, 80–100% amber, above 100% red, and missing limits grey. Equipment on an overloaded level is tinted red; a global wind overload does not mark all local levels as overloaded. A separate base ring and scene warning indicate global exceedance. Quick panel controls add 30 kg and 0.8 m² at the selected level.
What is outside scope
This is an applied-action and reference-limit screening model, not a code resistance verification. It does not derive site wind pressure, load combinations or partial factors, force/dynamic coefficients, member buckling, axial/bending interaction, torsion, eccentric gravity actions, fatigue, ice, deflection, guy tensions or pretension, mount/connection resistance, foundation capacity or geotechnical resistance. Independent reference ratios cannot establish combined structural utilization or approval. The global external moment of a guyed mast is not the internal mast-base moment. Reference limits must correspond to the same structure, wind direction and loading/design basis. Equipment examples and 3D shapes are illustrative. Direct-speed mode remains q = 0.5 × 1.225 × V², a simplified physics example.
EU / Swedish context
Use the applicable EN 1990 basis, EN 1991-1-4 wind actions and EN 1993 tower/mast steel provisions with Swedish national choices, and establish which BFS 2024:6 requirements apply. EKS was repealed on 1 July 2026; historic projects may have a transitional basis. SIS has published a second-generation 2026 tower standard; publication alone does not establish national applicability. Record the project’s edition and national annex.
Site Power & Resilience
What is implemented
A deterministic averaged-power operating model retains battery state across grid outages, rectifier failures, generator response and recovery. Effective capacity = nominal kWh × health fraction × supplied capacity-derating factor. Stored-energy change = charging input × charge efficiency × time − discharge output ÷ discharge efficiency × time. Rectifier output is limited by active modules and available AC power after AC auxiliaries; selected equipment is served before charging. Battery charge/discharge power limits and a configurable discharge cutoff apply; discharge reconnects five charge percentage points above cutoff. Generator start attempts, warm-up/transfer delay, grid-return hold, minimum run time and fuel exhaustion are modelled. Fuel rate = configured idle L/h + configured L/kWh × generator AC output. Three discrete equipment groups are prioritised: core/backhaul, coverage radio, additional capacity. Both core and coverage are required for service. Optional capacity shedding produces degraded service. Full equipment demand minus supplied demand defines unserved energy, including intentional shedding. Timeline steps are at most five seconds, split at scheduled events and relevant energy/fuel thresholds. Timing and threshold-controller responses remain numerical approximations. Manual timeline interventions replay the same starting condition with an earlier grid restoration, module repair or generator repair; a pinned baseline is retained for comparison. The shared cutaway technical shelter contains the batteries, rectifiers, DC distribution, baseband and transport racks; the tower radios and generator are outside. Shell and interior camera views are available. The 3D arrangement does not establish installation clearances or add a thermal calculation.
What is outside the model
All starting equipment ratings, failure schedules, fuel parameters and control thresholds are illustrative and editable. Health and temperature derating are supplied factors, not chemistry, weather or ageing calculations. The cutoff is a configured operating-model discharge limit, not a manufacturer BMS curve. No DC voltage, voltage sag, inrush, protection coordination, AC phase/frequency, reactive power, wiring, thermal response, fire safety, solar dispatch, refuelling or network coverage/throughput is calculated. AC auxiliaries have no battery-backed path in the displayed topology; loss is reported but its thermal consequences are not modelled. Generator output is limited at the configured AC power; transfer is represented by delay rather than electrical transients. EN 300 132-2 is interface context, not an implemented voltage or equipment-conformity assessment. Results require calibration and validation before operational use.
EU / Swedish context
Swedish telecom operators must assess their obligations under the Cybersecurity Act and applicable PTS rules. PTSFS 2022:11 was repealed in January 2026; PTS describes its former measures as an appropriate-measures baseline while new security rules are developed. This lab does not declare a universal statutory backup duration. Battery installation and electrical safety require a separate assessment under Swedish electrical rules and competent installation arrangements.
Fault Diagnosis
What is implemented
Eight deterministic incidents cover optical transport, rectifier shortfall, RF reflection, cooling, timing, VLAN attachment, obstruction-light failure and two simultaneous faults. Alarms map to 3D equipment. Targeted readings, staged maintenance, component retests and a separate end-to-end probe form an auditable learning record. ETSI TS 128 111 provides context; these are not vendor alarm codes or a conformant alarm interface.
What is outside scope
Values, thresholds, severity and service test profiles are illustrative. The model has predefined fault dependencies, simple battery energy depletion and exponential thermal recovery; it does not solve RF propagation, packet routing, thermal airflow or vendor diagnostics. Maintenance pauses service by assumption except for the separate obstruction-light circuit. No production network is queried. Exports are learning records, not regulatory submissions or field work instructions.
EU / Swedish context
For Swedish public electronic communications providers, assess significant incidents under the Cybersecurity Act and PTSFS 2026:5, in force from 15 October 2026. Reporting is through NCSC using the applicable instructions and time limits. A restored service does not by itself remove reporting duties. The lab does not decide legal reportability or submit reports.
City Network
What is implemented
Ten schematic city missions (Uppsala, Dubai, Berlin, Abuja, New York City, Delhi, Santiago, Cairo, Oslo and Madrid) in a 4 × 4 km teaching district. In the Build a site workspace, learners take one candidate location through 11 phases (planning, site acquisition, permits, design, civil works, structure, power, transmission, equipment, integration and acceptance) with choices, illustrative project costs and calendar weeks, simulated review gates and a growing 3D site; equipment costs reconcile with the city model and the accepted site joins the network. In Plan the city, learners build sites step by step, then operate LTE and 5G NSA (non-standalone) service with shared capacity, budgets, power and backup, backhaul and a shared EPC core. Coverage and delivered traffic are computed on a demand grid with illustrative link budgets and demand assumptions. Two guided challenges per city: a west-side fiber cut restored with protected transport paths, and a mains outage carried by battery or generator backup for at least two hours. Battery endurance uses each site's modelled equipment load and a city heat factor (6 kWh, 10% reserve); battery-only sites stop serving when energy runs out, while generator-backed sites continue in this ideal model. Terrain uses real Copernicus GLO-30 elevation; streets, buildings, water and parks use OpenStreetMap data. Reports (PDF/JSON) and learning sessions record the inputs, checkpoints and results.
What is outside scope
Demand, costs, radio performance and candidate sites are educational assumptions, not measured local traffic, operator sites or licensed spectrum. In Build a site, project fees, work durations, delays and event probabilities are illustrative teaching values; the review gates are simulations and grant no real permits, signatures, structural certificates or field measurements. Transport lines are schematic, not surveyed fiber routes; protected routing assumes an independent alternate path already exists. Power backup uses a constant load; battery recharge, generator fuel, start-up delay and installation time are not simulated. 5G Standalone, surveyed city propagation, handover protocols and detailed battery recharge are not modelled. Copernicus GLO-30 is a surface model that can include buildings and vegetation, not a surveyed bare-earth model; most OSM building heights are estimates. The lab is not a certified network design, coverage prediction or regulatory submission.
EU / Swedish context
The city districts are international teaching examples, not Swedish sites. For deployments in Sweden, radio licences and spectrum are administered by PTS, and resilience of power and transport for electronic communications services should follow the operator's own requirements and applicable Swedish rules. Map data © OpenStreetMap contributors (ODbL 1.0). Elevation: Copernicus DEM GLO-30 © DLR e.V. 2010–2014 and © Airbus Defence and Space GmbH 2014–2018, provided under COPERNICUS by the European Union and ESA.
- 3GPP TS 36.300 · LTE overall description ↗
- 3GPP TS 38.300 · NR overall description ↗
- 3GPP · 5G system overview (NSA / SA) ↗
- Copernicus DEM GLO-30 · data registry ↗
- Copernicus DEM GLO-30 · licence ↗
- OpenStreetMap · copyright and ODbL licence ↗
- PTS · Swedish Post and Telecom Authority ↗
Spectrum Allocation
What is implemented
Selected national spectrum excerpts for six country editions (Sweden, United Kingdom, Morocco, India, Germany and Argentina), shown on a logarithmic 3D frequency scale from 100 kHz to 40 GHz with a frequency probe, band inspector and wavelength. Eight everyday activities connect a use to its band: radio, antenna TV, streaming (internet to 2.4 GHz Wi-Fi), fire-service communications, a mobile video call, harbour radio, a remote clinic via satellite (14–14.5 GHz uplink) and a building-to-building link (10.7–11.7 GHz). Replayable country-aware walkthroughs, guided challenges, free-space path loss (ITU-R P.525) and band-width arithmetic. Each record cites its national source and review date. Summaries download as text; organisation requests open an email draft.
What is outside scope
Selected excerpts, not a complete allocation or licence database or a coverage planner. Allocation, actual use and permission to transmit are separate; primary is not exclusive and gaps are not free spectrum. Mobile entries are selected technical excerpts, not complete operator holdings. Public-safety examples differ in scope by country (planning pairs, shared bands or hypothetical crews are labelled as such); harbour channels are local port examples, not national channels. Free-space loss assumes ideal far-field conditions; width arithmetic omits guard bands, rasters, sharing and equipment limits. Satellite and fixed-link scenes are illustrative, not orbit, service, terrain or Fresnel designs.
EU / Swedish context
For Sweden, PTS administers radio spectrum and licences; maritime VHF follows Transportstyrelsen rules and Rakel is MSB's public-safety network. The lab shows selected Swedish excerpts with their sources. Other editions cite their national regulators (Ofcom, ANRT, DoT, Bundesnetzagentur / FreqV, ENACOM). Check current national rules and permissions before any real transmission. Country outlines: Natural Earth.
- PTS · Local licences 3.7 GHz and 26 GHz ↗
- Ofcom · UK Frequency Allocation Table ↗
- ANRT · Plan national des fréquences ↗
- DoT India · National Frequency Allocation Plan ↗
- FreqV · German frequency ordinance ↗
- ENACOM · Spectrum attribution (Argentina) ↗
- ITU-R P.525 · Free-space attenuation ↗
- Natural Earth · Country outlines ↗
6G Sensing
What is implemented
A free 3D campus where radios both connect and sense. Five missions: keep a warehouse robot connected and visible; observe a small unconnected civilian drone (with an advanced mixed-airspace test of drones, birds and objects); keep a delivery vehicle connected as a moving truck blocks paths, comparing reactive with sensing-assisted link selection; a connected factory under a production burst; and an edge-or-cloud comparison of on-device, local-edge and cloud processing. The model combines a radar-equation link budget with assumed radar cross sections, explicit opaque RF obstacles, a statistical detector, noisy delayed position observations, an idealised communication model and processing delays. Guided inspection, diagnosis, improvement and verification over three reproducible seeds; Radio A offline, processing-queue and clock-synchronisation fault recovery; energy and privacy comparisons that preserve the requested workload. English and Swedish interface, walkthroughs and reports; direct PDF, text and JSON downloads; local design save, import and export.
What is outside scope
The campus, targets and cost units are fictional teaching values; cost units are not currency. There is no waveform processing, measured radar calibration, trained target classifier, full electromagnetic ray tracing or certified 6G capacity prediction. Observations are evaluated every 0.25 s over 60-second routes. Class scores are uncalibrated and are not probabilities. The 3.85 GHz and 24.95 GHz profiles are reference comparisons informed by Swedish local-network information; the 8 GHz profile is a labelled research assumption. Nothing here claims finalised 6G specifications, spectrum authorisation, regulatory compliance or field validation. Redaction is an assumption, not proof of anonymisation. Site measurements and validation are required for operational planning.
Primary references
- ITU-R M.2160 · IMT-2030 framework ↗
- ITU-R WP 5D · IMT-2030 (scope and usage scenarios) ↗
- 3GPP TS 22.137 Rel-19 · ISAC service requirements ↗
- 3GPP TR 38.765 · ISAC study ↗
- ETSI GR ISC 001 ↗
- ETSI GR ISC 004 ↗
- ETSI GR ISC 005 ↗
- SNS JU · Architecture working group white paper (research context) ↗
- PTS · Local permits in the 3.7 GHz and 26 GHz bands ↗
- Rahman & Robertson (2020) · micro-Doppler context (no data reused) ↗
The register cites public primary sources. Full standards, applicable editions, national annexes and project requirements must be verified for the intended work. Source review date is shown above; this is not a claim of continuous regulatory monitoring.
BUILD WITH ASP
Your challenge. Your environment.
Need a version for your organisation or country? Talk to ASP about adapting a lab or building a telecom solution for your environment.